Install at Hospital in Surrey today

Install at Hospital in Surrey today, 2MW in a 65 dBA @ 1M Esion Acoustics Ltd enclosure sitting on top of Metcraft Group Ltd structural belly tank.


Check out the pictures at the bottom.


A lot of planning was involved with this one due to tight access into the hospital, 1 x Crane plus 50T ballast lorry, and three artics full of components. But all went to plan with no issues. 


Thanks once again to Brad & Gary from CSL Power Systems Ltd. For their assistance in the assembly. Can't emphasis how important it is to have trusted partners within this industry.


Also thank you to the guys from COUSSENS CRANES LIMITED for perfectly executed lifts to the millimeter. There was quite a bit of paperwork for this due to nearby airfields! 


Next week will be final fit out, installation of a new transfer with duplex pump set, Brugg dual walled pipework and leak detection, by our friends at Pipeflex Systems Ltd.



Fantastic work by all, perfect planning perfect finish and result!